The insulation credit that was never installed
A 70% reduction in fire relief load can disappear when design intent does not survive construction.
Read issue →Why making the exchanger shell diameter bigger can be a mistake
Your exchanger cannot meet duty. Before you increase dimensions, check where the resistance is coming from.
Read issue →The design case that passed every check — until turndown
Slug flow doesn't care about your normal-operation calculations.
Read issue →Does higher liquid density undersize or oversize your pipeline?
The answer depends on one question most engineers skip before opening a sizing sheet.
Read issue →Final hours: the 20% sale ends tonight
Code PDA032CD stops working at 11:59 PM tonight.
Read issue →Less than 48 hours left — 20% off ends Saturday
The Masterclass and every individual course return to full price Saturday at midnight.
Read issue →Heat exchanger over the allowable ΔP? Here's what I do.
Courses ON SALE! Master exchanger design, hydraulic calculations and process engineering
Read issue →Exciting news: 20% off every Boostrand course
For one week only, every course is 20% off — including the full Masterclass. Here's what that unlocks.
Read issue →