Boostrand

All issues

Exciting P&ID Course Update - Review of a Real P&ID

Explore our latest update with a hands-on walkthrough of P&ID drawings and an in-depth checklist review. Check it out now!

Hello

Today I have finished a major update to the P&ID course.

This is a totally new section applying what we have gone through within the course.


In this update, we shall go through a live example of 2 P&ID drawings containing a 3 phase separator, a pump and a heat exchanger, checking all details in these P&IDs and why they look that way.


In addition, we shall apply a checklist to review the P&IDs. Through this checklist, we have reviewed each portion of the P&ID, and added tons of comments to apply proper common practices regarding:

  1. Checking general P&ID details
  2. Piping details, e.g. spec breaks, reducers, no pockets and minimum distance
  3. Walking through Instrumentation details, performance measuring, alarms and controls
  4. Holds pending input from vendors
  5. Maintenance, isolation valve locking and drainage
  6. Discovering mismatch between PFD and P&ID
  7. Dealing with different upset scenarios
  8. Checking fire scenario
  9. Heat exchanger arrangement
  10. And even more


This was how the checklist ended up:


image


And this was how the P&ID comments looked like at the end!


image


Through an approximately 2 hour section, we have addressed all these details. I hope you shall enjoy this section.


Whether you were subscribing in my P&ID course or in the Process Engineering Masterclass or in Udemy P&ID course, you can check out its last section.


At the end, I must highlight that your feedback is invaluable! If you have any questions or suggestions or comments, I’d be more than willing to listen.


Happy learning!

Mohamad

Share
Get the next issue in your inbox
Free, and you can unsubscribe any time.

0 comments

More issues

All 175 →
#77 May 28, 2024

P&ID Review and Checklist - Avoid Costly Mistakes

Read issue →
#76 May 18, 2024

Process Simulation is not just about software! It's impacting the whole Project

Read issue →